Issue Encountered
The client, specialized in
waste massification, requires a tailored solution to
optimize the outdoor storage and management of its materials. Massification involves grouping large quantities of waste to reduce logistics costs and improve transport efficiency to treatment centers.
In this context, the client has already created a
storage cell using OTEXBLOCKS® concrete blocks to store plasterboard. This plasterboard, delivered by multiple trucks, is then loaded onto a semi-trailer and transported to a specialized treatment center.
The challenge lies in implementing a solution that effectively
protects the plasterboard from weather conditions while meeting the
site's logistical and operational constraints.
Solution proposed by OTEXIO
OTEXIO suggested installing the
RCOVER®BOX tarping system, perfectly suited to cells built with concrete blocks. This system ensures
100% waterproof coverage thanks to its PU tarp and side flaps. Its structure, consisting of
steel arches running on rails, allows quick and obstacle-free opening and closing of the cell, thereby providing an unobstructed area for loading and unloading.
Installation of steel arches on rails: Key Advantages of the
RCOVER®BOX System:
- Opening and closing in under one minute using a crank.
- Optimized access to the cell, enabling operators to maneuver machinery or trucks safely and easily.
- Guaranteed waterproofing, ensuring secure material storage and protection against bad weather.
Crank-operated opening and closing system with a chain: Additionally, the
RCOVER®BOX system is backed by a
ten-year warranty, ensuring the durability and compliance of its installations.
The installation was carried out in strict adherence to safety guidelines for working at heights, including the use of harnesses and aerial work platforms. OTEXIO's teams ensured a smooth and secure setup, addressing all specific site constraints.
Client feedback
The client is highly satisfied with the
RCOVER®BOX solution, which perfectly meets their
protection and logistical optimization needs. The installation was completed seamlessly, without incidents, and the environmental and logistical constraints were meticulously managed by our OTEX’PERTS.
Thanks to the system, the cell is now fully protected from the elements, ensuring optimal storage of plasterboard while awaiting transport.
The system's ease of use and integration into the site’s operations have streamlined the work of on-site teams. The client
rated the product 8/10, highlighting its
reliability,
efficiency, and the
quality of collaboration with OTEXIO.